Manchester Head Office Workstation Solution
"Our challenge was to find a bench solution that could offer integrated power and data, protect the design aesthetic in our new head office and create flexible working spaces. Staverton CL achieves this and surpasses everything else on the market. It was borne out of collaborative and clever thinking – Staverton really listened to our brief"
Craig Lambert
Facilities Manager, The Co-operative Group
Project Overview
Staverton worked with The Co-operative Group to design a bench workstation for their new Manchester head office that aligned with their open-plan aesthetic and above-floor power requirements. The result was Staverton CL — a sleek, functional bench with integrated power housed in the leg, inset desktop access, and concealed cable management. This tailored solution delivered over £250,000 in electrical installation savings and created a flexible, design-led workspace through close collaboration and intelligent engineering.
£250K
saved with bench's built in power distribution unit
0
Visible Cables
100%
Above-Floor Power Integration, reducing build complexity and cost
Gallery
Featured Projects
Explore our portfolio of successful workplace transformations across various industries
Hear what our clients have to say about their experience working with us
Reviews
“We wanted a bench solution that would support our team’s dynamic and collaborative working style and at the same time make ongoing IT and maintenance much easier by bringing all power above the floor. Staverton stood out because the design team really listened to what we were trying to achieve”
Alison Ross
Technology Director, AutoTrader Group
“I would like to thank you Paul and your team at Staverton’s for all the hard work and assistance in helping us choose the furniture/layout and installation for our new offices. The furniture all fits perfectly, is of a very high quality and looks stunning. The service has been impeccable especially under these very difficult times”
Suzanne Cudd
Executive Administrator, DP World Southampton
“I have enjoyed a very successful working relationship with the Staverton team over the last 5 years and selecting them to work with us on this time critical and high profile project was an easy decision. The project team which we developed with Paul Edward and Charles Gee performed as we have come to expect from Staverton, delivering exceptional results in a professional manner, on time and on budget. It has been a pleasure to work with them on this project and we are delighted that we have more than met our expectations with the results”
Stephen Quantick
Facilities Manager, Tullett Prebon
“We are all very happy with the results. We are now in really nice offices… and we find it much more collaborative than it was before, due to the fact that we now work in an open-plan space. I would recommend Staverton and I would definitely consider them for future projects”
Sylvain Pignet
Group Company Secretary, Travelex
“Staverton truly engaged with us to enable the best possible outcome and continuously worked hard to successfully fulfil all our requirements. They worked in collaboration with us to help make the change happen. We would be very happy to use them again in the future”
Mark Henderson
Supply Chain & Procurement, Severn Trent Water
“Staverton’s customer focus, quality products and expert advice always ensure we receive the best service and attention from a wonderful, friendly and flexible team. Their innovative ideas allow us to provide more suitable spaces for our clients while always meeting our often urgent and short-notice demands”
Phil Goddard
Facilities Manager, Visa Europe
arrow rightarrow right
leave a message
Reach out to our team and we will respond ASAP.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.